Service Connections
Service connections are connections to the wastewater (sewer) network, the water network or the stormwater network.
Service connections are connections to:
- The wastewater (sewer) network
- The water network
- The stormwater network:
Either a direct connection to the pipeline or outlet to kerb
Service connections; how to arrange service connections to your property
The property owner, drainlayer, or contractor makes an application to the Council together with an application fee for a service connection. This can be done when applying for a building consent.
- The Council gives approval for a connection and provides network information for the use of the contractor.
- The applicant engages an Approved Services Contractor and notifies the Council.
- The Approved Services Contractor arranges road opening notice and permits.
- After the work is completed the Council inspects and issues a certificate of completion to the contractor with a copy to the applicant.
- The property owner then pays the contractor for the work done after receiving the certificate of completion. (The Council is not liable for any of the contractors costs)
Engaging a contractor
- It is the property owner’s responsibility to engage an Approved Services Contractor to do the work.
- The Council has a list of these contractors - only Approved Service Contractors can be engaged.
- The property owner chooses the contractor they wish to engage.
- Work cannot begin until there is approval from the Council and the Council has been notified who the Approved Service Contractor is.
- All services being connected at the same time are to be done by the one Contractor.
- All listed Approved Service Contractors have agreed to provide connections to Council standards.
Payment of application fees to council
Payment can be made in two ways:
- Pay the full service connection application fee and inspection fee when application is made.
- Pay the application fee only when the connection is applied for and the inspection component when the approval is collected.
| Services Required | Processing of
Application | Inspection | Total Fee |
| One connection to network (sewer, water or stormwater) |
$15.00 |
$75.00 |
$90.00 |
Two connections to networks |
$25.00 |
$110.00 |
$135.00
|
| Three connections to networks |
$35.00 |
$145.00 |
$180.00 |
| Stormwater to kerb connection only |
|
$22.50 |
$22.50 |
| One connection to network (sewer or water) and stormwater to kerb |
$15.00 |
$97.50 |
$112.50 |
| Two connections to network and stormwater to kerb |
$25.00 |
$132.50 |
$157.50 |