Wastewater Treatment Plant Open Day

Saturday 7 Mar 2020 Add to calendar

Photo shows the wastewater treatment plant from the river, with wetland plants in the foreground.

On Saturday 7 March you'll be able to get a firsthand look at where your wastewater goes once you flush, turn off the tap, or remove the plug.

We're opening up our Wastewater Treatment Plant for tours between 8.30am and 12pm.

We'll show you the extensive process currently involved in treating our wastewater, and show you around the large site.

As the treatment plant will be operating during the tours, health and safety is a top priority. Everyone taking part in a tour must be over 10 years old. Everyone must also wear flat, closed-in shoes.

A reasonable level of fitness is required as the tour will involve stairs and uneven surfaces.

If there is heavy rain or wind, the tours will be cancelled due to safety concerns. We will notify you by email if this occurs.

Register for the tour

This will help us to manage the tours safely