Plan change 15A-H decision, appeals & consent orders

On 1 September 2016, the City Council made a decision on proposed plan change 15A-H to the Palmerston North District Plan. Parts of the plan change are considered operative, but other parts are subject to appeal.

Decision Information

The full text of the decision and reasons for it follow:

Proposed Plan Change 15A-H addressed the following topic areas:

A. Rural Zone and Rural Subdivision
B. Wind Farms and Landscapes
C. Boundary Change Area (the area formerly within the Manawatu District)
D. Flood Hazards
E. North East Industrial Zone and Extension Area
F. Braeburn Industrial Area (Longburn)
G. Utilities
H. Airport Zone

Viewing the decision

 The decision is available for viewing at the following offices:

  •  The Customer Service Centre, Palmerston North City Council, Civic Administration Building, The Square, Palmerston North;
  •  The Palmerston North Public Library, The Square, Palmerston North; 2nd Floor, NZ Pacific Islands Zone.

Commissioners' Minutes - Corrections to Decision

Commissioners' Minute dated 14 September 2016

Commissioners' Minute dated 23 September 2016

Decision

Decision of Commissioners dated 1 September 2016 (Pdf 1.6Mb)

Appendix 1 of the Decision includes a list of all District Plan amendments.

District Plan as amended by PC15A-H Decision

Appeals to the Environment Court & Consent Orders

Twelve appeals were lodged on Plan Change 15A-H.  The following appeals have been resolved via Consent Order:

Appeal Summary of Changes

NZ Fire Service v PNCC

[status: resolved]

Section 9 Rural Zone
Amendment to Rule 9.5.5 Dwellings, Accessory Buildings and Relocated Dwellings and Accessory Buildings

New performance standard (i) Provision of Water Supply requires firefighting water supply to be provided via either a 45,000L supply or a home sprinkler system (if water-supply for fire-fighting purposes is not available to the lot as a result of a previous subdivision).

Section 7 Subdivision
Amendments to the 7.4 Method in Relation to Policy 2.8 and 3.1

The implementation of these policies will now be assisted by the provisions of the New Zealand Fire Service Firefighting Water Supplies Code of Practice SNZ PAS 4509:2008.

Amendment to Policy 3.1.1 that requires adequate provision of water supply for firefighting.

North East Industrial Zone Extension Area (Subdivision)
New performance standard for Restricted Discretionary Rule 7.9.2.1. New performance standard (a)(iii)(k) requires a development scheme to demonstrate how firefighting water supply is intended to be provided.

Rural Zone Subdivision
Amendment to Controlled Activity Rules 7.16.1.1 & 7.16.2.1

Any subdivision needs to demonstrate:

• The ability for the proposed lot to provide on-site water supply for firefighting purposes.

NZTA V PNCC 

[status: resolved]

Section 9 Rural Zone

New Rule 9.11.2 Noise Insulation: Road Traffic Noise

The new rule requires any new habitable room (including any addition of a new habitable room to an existing building or relocated dwelling) in a building to be used by a noise sensitive activity to be located at least 20 metres from State Highways 3, 54 and 57 and provide acoustic insulation.

Section 20 Transportation

New Rule 9.11.2 Noise Insulation: Road Traffic

KiwiRail v PNCC

[status: resolved]

Section 9 Rural Zone

New Rule 9.11.3 Noise Insulation: Rail Noise

The new rule requires any new habitable room (including any addition of a new habitable room to an existing building or any relocated dwelling) in a building to be used by a noise sensitive to be located at least 30 metres from the edge of a railway track and provide acoustic insulation.

Section 20 Transportation

New performance standard (e) in Rule 20.3.10 Access: Vehicle Crossings in Proximity to a Rail Level Crossing

The new performance standard requires all new vehicle crossings to be set back a minimum of 30 metres from a rail level crossing.

Spark NZ v PNCC

[status: resolved]

Section 23 Utilities

Amended note to Plan Users associated with Rule 23.7.2(f).

The note relates to the height of antennas and associated mounting(s).

Heavy Haulage NZ v PNCC

[status: resolved]

Section 9 Rural Zone

Amended Rule 9.5.5(h) Relocation of Dwellings & Accessory Buildings

Requires reinstatement and certification of exterior works to be completed within 9 months of any building being delivered on-site.

NZ Wind Farms, Tararua Wind Power, Meridian Energy v PNCC

[status:resolved]

Section 9 Rural Zone
Amendment to Discretionary Wind Farm Rule 9.8.6(ii)

Amended performance standard (ii) sets a threshold at which wind farm activity will be treated as a non-complying activity where an affected landowner has not given their written approval.

 Powerco and Manawatu-Wanganui Regional Council v PNCC

[status: resolved]

Section 22 Natural Hazards 

Amendment to Permitted Activity Rule 22.7.1.1 (Flood Protection Zone)

New performance standard (v) in Rule 22.7.1.1 allowing non-habitable structures on production land or network utilities within the Flood Protection Zone.

New Restricted Discretionary Rule 22.7.2.2 and Non-Comply Rule 22.7.4.1 were non-compliance with Permitted Activity Rule 22.7.1.1 occurs.

Amendment to Permitted Activity Rule 22.8.1.1 (Flood Prone Areas)

Amended Rule 22.8.1.1 allowing:
(i) Non-habitable structures or network utilities on production land
(ii) The operation and maintenance of existing network utilities or critical infrastructure on production land
(iii) Minor upgrading of network utilities on production land
(iv) Installation of underground network utilities on production land

New Restricted Discretionary Rule 22.8.2.1 where non-compliance with Permitted Activity Rule 22.8.1.1 occurs.

Section 23 Network Utilities
Amendment to Permitted Activity Rule 23.7.1.1 Relationship of the Network Utilities Section to the District Plan as a Whole.

In Rule 23.7.1.1, amend performance standard (a) height to exclude lines’ support structures from the height rule.

 Heritage Estates v PNCC

[status: resolved]

Section 9 Rural Zone
In respect of the City West residential growth area, an amendment to Policy 1.1 to recognise:

(i) The importance of appropriately addressing liquefaction risk and mitigation options; and
(ii) The need for the provision of adequate integrated network infrastructure.  

Enquiries

A:   Rural Zone & Subdivision
B:   Wind Farms & Landscapes
C:   Boundary Change Area
D:   Flood Hazards
David Murphy  l  (06) 356 8199
david.murphy@pncc.govt.nz

E:   North East Industrial Zone & Extension Area
F:   Braeburn Industrial Area (Longburn)
Jonathan Ferguson-Pye  l  (06) 356 8199
jonathan.ferguson-pye@pncc.govt.nz

G:   Utilities
H:   Airport Zone
Michael Duindam   l   (06) 356 8199
michael.duindam@pncc.govt.nz