Dutton Street and Maple Street water main installation

We're installing a new water main between Dutton Street and Maple Street, starting Monday 9 November.

Our crews will be working from 7am to 5pm, Monday to Saturday, with work expected to take around four weeks.

Part of the job involves installing a new pipe beneath the railway line. To do this, we'll need to close Campbell Road for one day. We'll confirm the date closer to the time and display it on electronic roadside signs.

While the road is closed, you can get around using Dixons Line, Raymond Street and Ashhurst Road.

For the rest of the work, Campbell Road and Railway Road will stay open with stop/go traffic controls in place. Please plan ahead for short delays.

Flygers Line rebuild

Flygers Line will be closed over the coming weeks

We’re rebuilding and widening about 400 metres of Flygers Line, from Milson Line to the bridge – as shown on the map below.

Work is expected to continue until mid-December, weather permitting.

During this time, Flygers Line will be closed to through traffic from Milson Line to SH3 Rangitikei Line.

How Flygers Line residents can access their properties

If you live on Flygers Line, you'll still be able to access your property during the closure periods. However, you'll need to speak with traffic management staff at the road closure to arrange access. Please allow a few extra minutes for your journey.

The intersection of Gemini Avenue and Flygers Line will be closed for the duration of the project to everyone except Flygers Line residents, as this will be used as the one point of entry for you to get to and from your properties (as shown by the green arrows on the map).

If you live on Gemini Avenue or the surrounding streets, please use John F Kennedy Drive as your main route in and out of the neighbourhood.

Aerial map showing the Flygers Line roadworks area between the bridge and Milson Line, with resident-only access via Gemini Avenue marked in green.

Hardie Street and Collingwood Street intersection temporary road closure

The intersection of Hardie Street and Collingwood Street will be closed to through traffic from Monday 9 November to Friday 13 November, between 7am and 4pm each day.

We need to close the intersection to install new manholes as part of our wastewater infrastructure improvements.

A signed detour will be in place. Please use Jickell Street or Centennial Drive to exit the area.

We understand road closures can be disruptive and appreciate your patience while we carry out this work.

We're still on track to finish the wider project around Christmas.

If you have any questions, please contact our water team on 06 356 8199.

Matipo Street rebuild

We're rebuilding part of Matipo Street, including a small part of the Konini Street intersection, and upgrading vehicle entranceways in the work zone outlined below.

Parts of the street will be closed in stages, and access to Matipo Lane for businesses and buses will change as those stages progress.

Work is expected to take about four weeks, weather dependent.

Map showing the section of Matipo Street near Konini Street and Matipo Lane that will be closed in stages.

 

We’re using a stronger foundation to speed up construction

We're using a new method called Inforce Neoloy Tough-Cell beneath Matipo Street to strengthen the road's foundation and help speed up the rebuild.

Think of it as a strong, honeycomb-like grid filled with crushed rock. The cells hold the rock in place and help spread the weight of traffic.

This reduces the need for deep excavation and compacting loose material, saving construction time. The grid sits beneath the asphalt, so it’s not the final driving surface.

Honeycomb-like Inforce Neoloy Tough-Cell grid filled with crushed rock to strengthen the road foundation beneath Matipo Street.

 

 

Midhurst Street rail crossing closure

KiwiRail is upgrading the asphalt at a rail crossing on Midhurst Street.

To complete the work safely, Midhurst Street will be closed to through traffic from 7am to 7pm on Sunday 22 and Monday 23 November. The road will reopen each evening.

There will be no through access across the rail crossing while the closure is in place. Resident access will be available from either end of Midhurst Street, with traffic crews managing access around the work area.

Please use an alternative route while the closure is in place.

 

Pahiatua Track Road closure

Goodman Energy will be carrying out safety improvements at the intersection of Pahiatua Track Road and North Range Road from Monday 2 November to Saturday 5 December 2026, weather dependent.

The work includes road widening, pavement repairs, asphalt resurfacing, and new traffic signs to improve safety at the intersection.

Road closures and traffic management

Traffic management will be in place Monday to Saturday, with the following arrangements:

  • 7am to 9am: Stop/go traffic management
  • 9am to 3pm: Full road closure
  • 3pm to 6pm: Stop/go traffic management

During the full closure, drivers will need to use State Highway 2 and State Highway 57 as the alternative route.

Please plan ahead, allow extra travel time, and follow temporary traffic signs and instructions from workers on site.

Questions about the work?

Contact Daryl, Goodman Energy project manager, on 027 465 2006.

Map showing the Pahiatua Track closure near North Range Road and the alternative route via State Highways 2 and 57.

Palmerston North streets summer resealing programme

We’re resealing 37 streets across the city this summer as part of our annual maintenance programme.

See the 37 streets being resealed this summer

Redmayne Street water main upgrade

We’re upgrading the water main on Redmayne Street to help improve the water supply in Bunnythorpe.

Work starts on Wednesday 11 November, with our crews working from 7am to 4pm, Monday to Friday. We expect to have everything wrapped up in December.

There'll be traffic management in place to help you get safely around the area.

Saddle Road closure

Saddle Road will be closed for planned road repairs from Tuesday 8 December for about one week.

Crews will remove damaged sections of the road and lay new asphalt at several locations along the Saddle Road. Work is expected to take about a week, with an additional week allowed in the programme if weather or other unexpected delays affect progress.

Saddle Road will be closed to through traffic during working hours while the repairs are carried out. The road will reopen each evening.

A signed detour will take traffic through Ashhurst on Salisbury Street, Mulgrave Street and Cambridge Avenue to State Highway 3/Manawatū Tararua Highway and Woodlands Road on the Woodville side. Traffic travelling in the opposite direction will follow the same route in reverse.

The detour is expected to add about one minute to your normal journey.

People living on Saddle Road will be contacted directly about access while work is happening. Access may need to be restricted for short periods around the active work area while sections of the road are being repaired.

Weather permitting, all work is scheduled to be completed by Friday 18 December.

 

State highways – roadworks and journey planning

NZTA is responsible for state highways. Visit its website for information about the work it's doing. There's also a journey planner to help you plan your trip, including updates on delays, roadworks and road closures. 

Te Awe Awe Street roundabout upgrade

We’re doing a series of upgrades at the roundabout of Te Awe Awe Street, Albert Street and Pahiatua Street from Monday 7 December to Tuesday 15 December.

The first stage involves a lane closure and four-way stop/go traffic management at the roundabout. The second stage requires a full closure of the roundabout over two nights.

7 to 12 December – lane closure

Work will take place between 7am and 7pm each day.

We’re replacing the kerb and channel (roadside drain), pedestrian crossing, footpath ramp and central concrete island on the left-hand side of Te Awe Awe Street approaching the roundabout.

During this time, the left lane of Te Awe Awe Street heading northeast towards the roundabout will be closed. Four-way stop/go traffic management will be in place so vehicles can continue to use the roundabout.

Map showing the upgrade area on the left-hand side of Te Awe Awe Street approaching the Albert Street roundabout.

13 and 14 December – full overnight closure

The entire roundabout will be closed from 6.30pm to 6am on Sunday 13 and Monday 14 December, reopening each morning.

We’ll be resurfacing the entire roundabout. This involves a mill and fill treatment, where the worn road surface is ground off and removed, then replaced with new seal to protect it from water damage.

We’re doing this work over two nights to reduce the impact on businesses and motorists in the area.

We’ll complete the noisiest parts of the work by 10pm and aim to be off the road by 5am each morning.

The map below shows the road closure points for the overnight work. Residents will continue to have access to their properties.

Map showing overnight road closure points on all four approaches to the roundabout, including Albert Street, Te Awe Awe Street and Pahiatua Street.

Access and parking

  • Access to properties will be maintained at all times.
  • Parking outside local businesses may be affected during the work.
  • The footpath on the left-hand corner of Te Awe Awe Street and Albert Street will be closed. Please use the footpath on the other side of the road.
  • Temporary pedestrian crossings or pedestrian marshals will be available during construction.

Work is weather dependent and dates may change.